Electricity, Gas, Solar Panels, Against Fires

Contact an Installer

Specialized in the calculation of all these facilities mentioned as well as certifications and procedures for city councils, industry and energy department.

We collaborate through agreements with Authorized Control Bodies to issue Periodic Inspection Certificates for Community Garages, elevators and places of public attendance.


You will need an electrical bulletin on several occasions:

  • To register a new installation.
  • When there is a change of ownership in the electricity supply.
  • If the installation is more than 20 years old.
  • To increase the contracted power if it exceeds that allowed.
  • If there has previously been a supply cut due to non-payment problems.



The low voltage electrical installation certificates are issued by an authorized electrician installer or by the installation company. Authorized technicians are electricians, engineers or architects who have an authorization or a certificate of professionalism included in the national catalog of professional qualifications, coinciding with the matters covered by the low voltage electrotechnical regulation approved in 842/2002.


doWho can you sign an electric bulletin?

A bulletin (BRIE) or certificate of the electrical installation (CIE) it can only be signed by an authorized installer, as indicated in the ITC-BT-03 of the Electrotechnical Regulation for Low Voltage (RD 842/2002). This authorized installer must have the IBTB basic category card or the IBTE specialist category card.

regulations and requirements of the electrical bulletin

The electricity bulletin is regulated according to Royal Decree 842/2002 of August 2, 2002, which was published in the Official State Gazette number 224.

In addition to the national regulations, each autonomy has its own laws.


DATA FOR THE LIGHT BULLETIN

SEND US THE SUPPLY DATA

When must the gas bulletin be submitted?

The gas certificate can be requested by both thedistributorof the area such asmarketerchosen in the following cases:

  • Discharge natural gashein a newly built property.
  • Reactivate the gas supply if it has been out of service for a period of 2 years.
  • Make a change in the installation or its elements, such as boiler or radiators.
  • Change vendor.

Change gas rate.

What is the gas installation certificate?

The certificate certifies that the installation of natural gas, butane or propane in the home or business has been carried out correctly, or that it has successfully passed its review. The certificate of the individual installation can also be calledgas bulletinor model IRG-3. This certificate should not be confused with the one issued after the revision of the boiler.


Natural gas certificate


In the case of natural gas, thecertificate of the Individual Receiving Facility(IRI) guarantees that it is safe to receive the supply in a building.

In addition, if the home is located in a community of neighbors, theCommon Receiving Facility certificate(IRC), as a document that proves that the general installation has been carried out correctly. It is essential to supply the gas in all the dwellings of the building.


What is the IRG-3 model?


The IRG-3 model is the name of the document that has to be filled out and stampedauthorized installer, certifying that the individual gas installation is in good condition.

According to the natural gas regulations, it must be accompanied by a sketch of the installation and the list of appliances installed or planned.


Who can issue the gas certificate?

The certificate must be issued by theauthorized technicianto carry out the installation or periodic inspection, ensuring that the installation complies with the safety measures contained in theRITE(Regulation of Thermal Installations in Buildings).

The installer can work for thedistributoror in a gas installation company. In any case, the distributor will always verify that the security measures are complied with, or it will not activate the supply.


Fire protection


Frequent questions

  • When is a fire project necessary?


  • What legislation regulates the installation of fire protection?


  • The fire project

    The fire project, the set of procedures and equipment necessary for a building to be shielded against the possibility of a fire.

COMPANIES AND SELF-EMPLOYED


  • FIRE PROTECTION SYSTEM FOR BUSINESSES.

Everything you need in your business about fire extinguishers, fire groups and more.


  • INDIVIDUALS AND COMMUNITIES

Everything you need to protect your home: video surveillance systems, fire extinguishers, smoke detectors and other protectors for your home.


  • FIRE PREVENTION FOR TOURIST ACCOMMODATION

Whether you are a Hotel, Camping, Apartment or other type of accommodation.

We have everything necessary to offer fire protection coverage, security and control systems to tourist accommodation in relation to the current regulations of the sector and for the benefit of the company.



  • HOSTELRY:

If you are a company related to hotels or restaurants, we know the current regulations on safety and fire protection as well as the correct maintenance of the facilities established by law.

You can also count on advice and access control products required by law for workers.


  • INDUSTRIAL SHIPS

We adapt the protective elements for fire prevention according to the category and professional activity of the industrial warehouse and its obligations with respect to current regulations. We will have passive and active protection based on particular needs.

  • PUBLIC SECTOR

In continuous expansion, there are already various Public Administrations, City Councils, the health network and the educational network that have the security and protection that it guarantees through good maintenance of fire extinction, detection, security and prevention facilities.



Currently it is mandatory for any establishment to have

ready the fire project as part of the application

and obtaining the opening license


Link to regulations


Get more information

Using renewable energy instead of fossil fuels is key to asustainable developmente. Solar energy is one of the best known and most used renewable energies in Spain, due to the large number of hours of sunshine. But what is solar energy and how is it produced?

Solar boards


What is solar energy and what does it consist of?

Solar energy is a renewable and inexhaustible energy obtained from theelectromagnetic radiation from the sun.

It generates electricity and heat in a totally sustainable and free way.


easy integration

Advantages of solar energy

Significantly reduces carbon footprint. It is a clean energy that does not generate greenhouse gases or pollution during its use. It is a renewable and sustainable energy. It can heat, something that other renewable energies do not offer..

flexible features

  • 100% inexhaustible, renewable and free energy;
  • It does not emit toxic substances or air pollutants;
  • Reduces the use of fossil fuels;
  • Increasingly competitive energy;
  • Reduces dependence on the consumption of the electricity grid and natural gas;
  • Subsidies for self-consumption;


Professional services

Our team is trained to always offer you the best services. And, in addition, we are very friendly.

Competitive prices

We offer a variety of pricing options so you can find the ideal plan for your budget.

WHAT PROCEDURES YOU NEED TO START

The first thing is to prepare a Technical report if it is less than 10 kW and if it is more than 10 kW, present a Project.


REQUEST PERMISSION FROM THE ELECTRICAL NETWORK

Regardless of whether it is surplus or non-surplus, they must be negotiated with the power grid company.

For more information about the regulations click here link


REQUEST A BUILDING LICENSE PERMIT

It is necessary to request it in your town hall, as well as pay the tax (ICIO) depending on the area in which you are, you can also benefit from aid or subsidies.


CONSTRUCTION AUTHORIZATION

This permit is as long as it exceeds 100 peak kW.

For those of small consumption it is not necessary. This permit is granted by your town hall.


ENVIRONMENTAL AUTHORIZATION

Only if it exceeds 100 kW


CERTIFICATE OF END OF WORK

It is necessary to certify that the installation has been carried out correctly


Below you can download the SOLAR PANEL PROCEDURE BEFORE PUBLIC ADMON


Download file Public Adm Procedure

INITIAL OR PERIODIC INSPECTION

Installations below 100 kW do not need an initial inspection, however those that exceed 100 kW peak do need an initial inspection and a periodic one every 5 years to check the status of the installation.


EXPLOITATION AUTHORIZATION

For installationions of more than 100 kW. This permit is issued by the corresponding community


ACCESS AND ENERGY SUPPLY CONTRACT

Photovoltaic installations that have a supply contract for auxiliary production services must request the access contract from the corresponding community


ACTIVITY LICENSE FOR PHOTOVOLTAIC INSTALLATIONS

This permit is mandatory as agreed with the electricity network. In the event of having a self-consumption facility with surpluses not subject to compensation, it will be necessary to consult the town hall.


REGISTRATION IN THE ADMINISTRATIVE REGISTRY OF SELF-CONSUMPTION

All installations with surpluses must be registered in the self-consumption administrative record


REGISTRATION IN THE REGIONAL REGISTRY OF CONSUMPTION

It is always when it exceeds 100 kW

Ask for information

CONTACT US AND WE WILL CONNECT YOU WITH TRUSTED INSTALLERS